Connect with us

News

Lincoln Electric to Use Wind Power

New tower increases sustainability efforts

Published

on

Lincoln Electric (Cleveland) has built a wind tower on the grounds of its headquarters and manufacturing campus in Euclid, just east of Cleveland. The 443-ft. tower’s (roughly equal to a 45-story building) propeller has a blade-tip speed of 165 mph. Approximately 7,000 hours were devoted to tower construction; the finished structure is expected to save the company up to $500,000 in annual energy costs.

The project is the outgrowth of a partnership between Lincoln Electric and the Great Lakes Energy Development Task Force, which aims to create a market for renewable energy in Northeast Ohio.
 

Advertisement

SPONSORED VIDEO

Introducing the Sign Industry Podcast

The Sign Industry Podcast is a platform for every sign person out there — from the old-timers who bent neon and hand-lettered boats to those venturing into new technologies — we want to get their stories out for everyone to hear. Come join us and listen to stories, learn tricks or techniques, and get insights of what’s to come. We are the world’s second oldest profession. The folks who started the world’s oldest profession needed a sign.

Promoted Headlines

Most Popular